Paper Roll To A4 Sheet Cutting Machine

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Zhejiang

  • Validity to:

    Long-term effective

  • Last update:

    2021-08-27 03:48

  • Browse the number:

    140

Send an inquiries
Company Profile
Ruian Take Off Machinery Co., Ltd
Contactaixin:

qifei(Mr.)  

Email:

telephone:

phone:

Arrea:

Zhejiang

Address:

No.2 Building 4, Yongle Lane, Baotian Dongzhou Village, Tangxia Town, Ruian City, Wenzhou City, Zhejiang Province

Website:

http://www.takeoff-machinery.com/ http://qifei.dy-sound.com/

Product details


Capacity:

1.Single roll unwinding : 1.5 ream/min (900 ream/day)(2.25 ton paper/day)

2.Double roll unwinding : 3 ream/min (1800 ream/day)(4.5 ton paper/day)

3.Four roll unwinding:6 ream/min(3600 ream/day)(9 ton paper/day)


Technical Parameter

Model

TO-1100

The max jumbo roll diameter

φ1400mm

The max jumbo roll width

1100mm

Cutting length

20-1200mm,A3,A4

Speed

20-200 times/min

Material GSM

40-450gsm

Precision

±0.2mm

Feeding Roll

One Rolls

Capacity

1.5 bags/min

Power

9.5KW

Voltage

380V/50HZ(Other can be customize)

Weight

4500kg

Dimension(L×W×H)

6200×3300×1400


Automatic sheet stacking system with pallet.

Fully automatic sheet stacker that can accommodate 2 pallets next to each other

Equipped with a jogging system at the front of the stack and at both sides to square the stack on the pallet

An additional separator can be mounted in the middle of the 2 stacks .

The system has to follow the stack height automatically.



Our New technology about the slitting cutter change:we must disassembly the Active and passive axes before change the

Slitting cutter,this new design can solve this troublesome operation.


Solution:A quick-change cutter structure of a slitting machine, including 1, 2 installed on the 1, and a

Including the 3, 4, 6, 15 is installed on the 3, the 5 is installed on the 4, and the driven shaft is

4 can be rotatably installed on one end of the 7, the other end of the 7 is fixedly installed on the 6, and the 6 and the worm gear reduce

The output shaft of the9 is linked, the input shaft of 9 is installed with 8, and 9 is fixedly installed on the wall.

On the plate 2, the 3 and 4 are linked through the 16, and 17 is installed on one of 2 to pair the main shaft.


http://www.takeoff-machinery.com/