Steel Cuplock Scaffold Board Bracket

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-29 23:50

  • Browse the number:

    74

Send an inquiries
Company Profile
Foshanshi Jin Qi Fa Metal Products Co. Ltd
Contactaixin:

jingchenghui(Ms.)  

telephone:

Arrea:

Beijing

Address:

No. 3 Industrial District, 3rd Rd., Beijiao town, High village, Shunde district, Foshan, Guangdong, China (510000)

Website:

http://jingchenghui.dy-sound.com/

Product details

Model Number: JCH-CS-07 Brand Name: JCH Key Specifications/Special Features: DescriptionCuplock is a very popular and versatile scaffold system that is in use all over the world. The ease of handling, easy storage space requirements and high load bearing capacity are the main reasons for its immense popularity.Cuplock scaffold metal hooked plankUse: The hooked planks can be used in conjunction with parallel ledgers to create a stable and secure working platform.Finish: Pre-galvanized, hot-dipped galvanizedSize: 230x63x1.8MM
Cuplock scaffold metal vertical standard
Use: The standard bears the vertical loads, with tube size 48.3*3.2MM and steel grade Q235 or Q345. The two cups has a distance of 500mm,with top cup drop forged and bottom cup pressed.
Finish: Hot-dipped galvanized
Sizes: 0.5M/1.0M/1.5M/2.0M/2.5M/3.0M

Cuplock scaffold metal horizontal ledger
Use: Theledger bears thehorizontal loads and forming the working platform together the planks. The ledger tube is48.3*3.2MM,with steel grade Q235 or Q345.
The ledger blade is drop forged.
Finish: Hot-dipped galvanized
Sizes:Upon requests

Cuplock scaffold metal bay brace
Use: The brace increases the lateral force at the sides.
The brace tube is 48.3*2.5MM.
Finish: Hot-dipped galvanized
Sizes: Upon requests

Packaging & shipping
All Cuplock gears are stocked in scaffold racks according to JCH
Product packing guide: Standard---170PCS per rack, ledger---250PCS per rack, brace---250PCS per rack and more.
We can help arrange shipment and have the gears delivered to the closest port near you.

Delivery
Our factory is located in Qingdao, which has the biggest port in North China. Our current lead time for regular scaffold is approx. 35 days after order confirmation and will be adjusted based on specific sizes and quantities.

Payment
T/T payment, 30% deposit, rest against the copy of B/L, L/C acceptable
Shipping Information:
  • FOB Port: Qingdao
  • Lead Time: 20 - 40 days
  • HTS Code: 7308.40.00 00
    Main Export Markets:
    • Asia
    • Australasia
    • Central/South America
    • Eastern Europe
    • Mid East/Africa
    • North America
    • Western Europe

    Other products